The Step-by-Step Plan for Commercial Office Repainting 

Commercial office repainting by a professional painter.

As a child, you probably didn’t expect you’d grow up to be someone who argues with upper management over commercial office repainting. Who knew there were so many different shades of white?

Once you get to the other side of heated discussions about office colour schemes, feature walls and branded colours, it’s time to get some paint on those walls!

Not sure how to choose the right commercial painter and ensure your project goes smoothly? Follow this step-by-step plan.

Commercial office repainting by a professional painter.

Step One: Information Gathering 

Before you start requesting commercial office repainting quotes, there are some important things to clarify first. The more info you can provide to the painter, the more accurately they can quote the job.

  • Building Rules

Is your office in a shared building? Check your lease and consult the property manager about restrictions, noise limits, access hours, and loading zones, especially if the painting work will be taking place after hours.

  • Insurance 

Commercial painters should have public liability insurance, but it’s always best to make sure your business insurance is up to date, too. Ask your insurer to clarify what requirements, if any, they have for tradespeople working onsite. If any of the office painting is part of an insurance claim, talk with your insurer first.

  • Room Audit

Go room to room, noting any issues you want to highlight with the painter, including wall dents or holes, tatty paint, stains, mould, or any other damage that may require specific paints or special treatment.

If you know the approximate dimensions of the spaces to be painted, you could note this down, too.

  • Ceilings and Floors

Do your ceilings need painting? You’ll need to note the materials they’re made of. Many offices use acoustic ceiling tiles which require a specialised paint.

Note the flooring in each room – carpet, tile or floorboards – so the painter can arrange adequate protection during painting.

  • Wall and Ceiling Fixtures

Note everything that’s attached to the walls and ceilings – whiteboards, light switches, wall sconces, ceiling lights, etc. What needs to be removed before painting, who will remove it and who will reinstall it post-painting? These are all things to discuss with your painter.

  • Lighting 

If you’re planning any lighting changes as part of your office refurbishment, you’ll need to consider how new lighting may impact your chosen paint colours and gloss levels. Ask your painter for advice on this.

  • High Traffic Zones

Identify the areas where painting could cause most disruption – for example, staff toilets and the kitchen. Where possible, arrange for these to be painted outside of business hours.

  • Health and Safety 

Research health and safety risks. If your office was built before 1980, there’s a risk of asbestos or lead paint. Talk to the painters about low-odour, low-VOC options, as well as the ventilation required to minimise discomfort. 

  • Scheduling

Don’t plan full commercial office repainting in the middle of your summer sales event! Look at your business’s upcoming schedule to pinpoint the quieter periods where painting would cause the least disruption. Provide two or three potential dates for the project and give a lead time of at least a month for the earliest option. You want to ensure your preferred painters have availability, and you’ll need time to prepare, too.

Step Two: Request and Review Painter Quotes

It’s time to obtain quotes for your office repainting project – two or three is ideal.

  • Painter Shortlist

When making your shortlist, look for reputable painting companies with plenty of commercial painting experience. The more experience and expertise your painters have, the smoother the project will go, and you’ll avoid costly disruptions or mistakes.

  • Painter Walk-through

When requesting your quote, you’ll pass on all the info you gathered in step one. However, most professional commercial painters will also attend your premises before quoting, and this is your opportunity to highlight any specific issues and ask any questions you have. For example, will you need to completely remove furniture from a space or can it be pushed into the centre of the room?

The painter walk-through is essential for them to quote accurately for the scope of the job, the materials and surface preparation needed, the number of tradespeople required, and the estimated timeframe to complete the work.

  • Project Timeframe

Commercial painting often requires prep and two to three coats of paint, which can increase the duration of the project, so always ask for clarity on how long the job will take. The more experienced the painter, the more accurate your time estimate will be, but always ask for the projected timeline in writing.

  • Review Quotes

Read all quotes carefully to understand exactly what is offered in each. Painting quotes should provide a comprehensive scope of work to be carried out, paint brands and products to be used, and a detailed timeline. Have they included who will be doing the prep work, moving furniture (before and after painting), and removing rubbish? If details are missing, ask for clarification.

Remember that a quote that is significantly lower than others is often a red flag – same goes for the promise of an ultra-quick turnaround. To be fast and cheap, a painter must be slashing time and costs somewhere – and that’s usually by cutting corners and using cheap paint. What saves you money today will cost you in the quality and durability of your office paintwork over the long term.

Once you’ve chosen a painter, check that your contract lists everything you’ve discussed, including the agreed-upon start and completion dates, before you sign off.

Step Three: Finalise Workplace Logistics

To ensure your project goes as close to plan as possible, you’ll need to make some key logistical decisions ahead of time.

  • Is there an opportunity to paint during a shutdown, or will you need to co-ordinate the project around normal business hours?
  • Is working from home an option for some staff for the duration of the project? Consult with management and HR teams to authorise remote work. 
  • If staff must attend the office, can they be temporarily relocated to another room/space? Consider co-ordinating staggered staff hot-desking throughout the project.
  • If furniture and equipment must be moved, do you have space to temporarily store it or will you need to arrange external storage? Most professional painting companies will help you work around needing to deal with major furniture relocations, so if you’re not certain what you should do, ask your painter!
  • Do the painters require after-hours access? Who will provide this?
  • Ensure all elements of the project are approved by the property manager and/or building manager in advance.

Step Four: Prepare Commercial Office Spaces For Re-Painting 

The project start is imminent. Here’s what you need to do to ensure the space is ready to go.

  • Provide Staff With a Project Schedule

Liaise with the relevant managers and teams to organise a staffing schedule that co-ordinates with the painting schedule. This lets everyone know where they need to be and when. The schedule may include minor prepping that staff must do ahead of painting in their area (removing personal items, locking desk drawers, etc.). Allow for a timeline buffer in case of unexpected delays and keep staff updated as the project unfolds.

  • Confidentiality

If you have company IP or client information, ensure these are stored safely and in compliance with data protection regulations.

  • Furniture and Equipment

Create a checklist for every room, with everything that needs to be moved/removed or covered before painting. This will depend on what you’ve discussed with the painters. Distribute the checklist to the appropriate staff so they know what to remove or relocate – and what needs to go back once the painting is done. Note down any preparation to be handled by the painters, to avoid confusion.

  • Temporary Storage

If you’re using part of the office as a temporary storage space, ensure it complies with fire safety and other workplace health requirements.

Step Five: During the Project

Arrange a daily walkthrough with your painters to ensure work has been completed as agreed and as per the timeline. Confirm the following day’s schedule and work to be completed, and update staff and management if there are any changes.

Request a Commercial Office Repainting Quote Today

When it comes to experience, few can match A.J. Cochrane & Sons. We’re award-winning commercial painters who’ve been serving Perth businesses for more than 90 years. For the highest quality commercial office painting, seamless project management, and unforgettable customer service, get in touch with our team today. Request your quote.

Leave a Reply

Your email address will not be published. Required fields are marked *

16 + 15 =